- Pending Items
Closed
17/34 Mentioned here are Pending
|
S.No. |
Subject |
Details by SAOA |
Response by M/s Modi |
|
1 |
Seepage
in Cellars during monsoon season |
This
has been pending since long. See the attachment, Annexure 1 |
Joint
inspection on 4th May 2019. To be completed by 30TH
June 2019. |
|
2 |
Seepages in Flats |
A
list (Annexure 2) is enclosed h/w with all the Flat details wherein seepage
has been observed since occupation. Data from some more flats who joined
after Nov 2018 is yet to be collected. |
Individual
flats to approach the builder for clearing the seepages. Analization of complaints will be done by
10th May 19. Further programme will be discussed in the next mtg. |
|
3 |
STP
work |
Status
is not known. Whether the drain from
all the flats is connected to the STP. Whether the output of STP will be fed
to OHT so that the water can go to
Flush Tanks . Operation of STP shall be demonstrated and run for a
month successfully before handing over. All documentation to be provided. |
Demonstration
of STP will be on 4th May 2019. |
|
4 |
Fire
fighting Equipment renewal document |
As per Mr. Ashok in amtg in 2017, last
renewal was done in 2013 and a copy of the same was requested to be shared
with SAOA office bearers. Still not done. |
Doc
will be given by 03.05.2019 |
|
5 |
Fire Fighting System |
Testing
and checking of Fire Fighting system in all Floors of all Blocks and
Basements. |
Demo
will be by 03.05.2019 |
|
6 |
Stair Case |
Lighting
(even fittings) is not provided in staircase area. Also the windows (near
landing area) are without any protection.
Some grill arrangement to be done for safety. Some of the steps are
not provided with polished stones. |
Combined
Inspection before 04.05.2019 |
|
7 |
Safety
Equipment near Generators |
2
Fire Extinguishers are to be provided at each DG. |
Will
be provided immediately. |
|
8 |
4th
DG SET of 125 KVA |
Standby
power supply of 640 KVA promised. But now, only 3 DGs of 125 KVA capacity are
available. Hence require another DG of 125 KVA atleast. |
Load
calculation will be done and provide as per the requirement. Will be reviewed
in next meeting. |
|
9 |
Documents
for different Utilities/equipment |
Handing
Over of documents for DGs, Lifts, Fire fighting, Drawings of Structural
design of Building which includes Water lines & drainage system and
Electrical wiring are to be made over. (check list) |
Will
be arranged by 04.05.2019. |
|
10 |
Building
layout |
All statutory doc related to Splendour.
Approved layout of Splendour site and GHMC approved Building plan showing all
the Blocks with all the Flats. |
Will
be arranged by 04.05.2019. |
|
11 |
Intercom
|
Builder
promised to provide Intercom facility to all the Flats in Splendour. Not done
so far. |
Need
to identify the Vendor. |
|
12 |
Panic
Buzzer |
Need
to be activated and connected to Security at Main Gate, with an indication
of Flat No. |
Will
be checked and get it activated. Will be reviewed. |
|
13 |
Accounts |
Audited accounts of the maintenance and
interest earned by SOA between the periods 2010- October 2016, to be provided
by M/s Modi. |
Will be provided by 04.05.2019. |
|
14 |
Mtce for Unsold
flats |
Pending since Nov 2018. |
Any pending payments will be done. SAOA
need to give the details. |
|
15 |
Flooring in B2 |
Tiles
to be laid in B2 as that in B1 |
Inspection
will be done by 04.05.2019. |
|
16 |
Water provision
in Corridors of all Floors |
A tap is to be provided in each floor of
all Blocks to facilitate cleaning of the corridors. Also 2 taps each in Cellars. |
Builder doesn’t accept this item. |
|
17 |
Drain of Rain water in Corridors |
There
is no drain outlet for the Rain water in the corridors of all floors. |
Builder
doesn’t accept this item. |
|
18 |
Car washing
facility in Basement |
To be provided |
Builder doesn’t accept this item. |
|
19 |
External buildings repairs and Painting including Basement |
To be done |
Will look
into. Review in next mtg. |
|
20 |
Mail Boxes |
To be provided |
Will look into. Review in next mtg. |
|
21 |
Electrical Fencing |
Solar fencing to be provided |
Will look into. Review in next mtg. |
|
22 |
Closing of entry
points for dogs especially near clubhouse and Tennis court |
To be done |
Will look into. Review in next mtg. |
|
23 |
Lifts |
C bk lift is troubling continuously. It
should be replaced with another make. All the 6 lifts in A & D bks are to be
auto as per original agreement. But Goods lifts of both bks are Manual. They
need replacement. |
Will look into. Review in next mtg. |
|
24 |
Sauna/steam Bath |
As
promised in sales deed cum broachers |
Will
look into. Review in next mtg. |
|
25 |
Builder is occupying 2000 Sft in Club House |
Builder
need to supply a copy of ruling which authorises him this action. If he fails
to supply that before th May 2019, this particular area is to be
handed over to SAOA. |
Builder
retains 2000 Sft in Club House as per GO 470. All other entire area of
Splendour belongs to SAOA. SAOA
may collect mtce charges from the users of 2000 sft in par with other
Residents. |
|
26 |
House Tax |
Property Tax for the Commercial areas is
not paid. GHMC Officials warned that the shops will be locked. |
-------- |
|
27 |
Billiards
mat |
Spoiled.
To be replaced. |
Will
look into. Review in next mtg. |
|
28 |
Parking |
List of Parking lots allotted to
individual Flats to be arranged. |
Provided today. |
|
29 |
Approach Road |
It was promised that the approach road to
Splendour will be 60 ft wide. Not yet done. |
Will use their good offices for
improvement. |
|
30 |
Rain Water Harvesting pits |
Pits are not done as per the standard
design. Pits to be to redone and additional to be provided. |
Will look into. Review in next mtg. |
|
31 |
Rain Water |
Water from Terrace is flowing down to GF
and the pipes are left open. The water is flowing open into the drainage.
Proper piping is to be arranged so that all the water flows to either to
Bores are to Harvesting pits. |
Will look into. Review in next mtg. |
|
32 |
Water
leakages near Over Head tanks |
OHTs
are leaking at many places making the building structure damage. Need to
check all OHTs for leak proofing. |
Will
look into. Review in next mtg. |
|
33 |
Gadavari Water connection |
Some of the Flats are still to get the
Godavari water connection to their Flats. A list of the Flats is being
prepared for submission to the Builder. |
Individual owners to approach builder. |
|
34 |
Closure of Construction works |
Building works in Splendour were commenced
way back in 2007 and still continuing even after 12 years. More than 300
families started living since 2015 and 160 added after that. All these
families suffered the disturbances caused by Builder’s continuous
construction works. Our continuous requests with the Builder to close the works, went in vain. This is
our final request to close by 31st May 2019. |
Builder is already in the process of
cleaning and will close all works by 15th May 2019. |
|
|
|
|
|